Examples of single measures in Emmerich at the Rhine

 

 

Project Example Sewer renewal Emmerich at the Rhine Sewer renewal "Von-Bodelschwingh-Straße", Emmerich at the Rhine
  • Construction of a storm water retention tank, with dry weather ditch and automated water flush cleaning system "mainly in diameters DN 1200 and DN 1400; applied materials: concrete and others;
    length of the sewer: 224.80 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer renovation, repairs and renewal in the protected water catchment area Emmerich at the Rhine
  • Sewer renovation in DN 300 to DN 500 with needle felt inliner (stabilised through hot water); length of the sewer 5,762.30 m
  • Reparation of sewer with the so-called "Janßen Pipe Rehabilitation System with Fregmentations", utilisation of short liners, branch piece injection; length of the sewer 818.44 m
  • Sewer renovation in DN 300 and DN 400; utilised pipe material GFRP (glass-fibre reinforced plastics); length of the sewer 169.02 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Renovation of the sewer "Rheinpromenade", Emmerich at the Rhine
  • Renovation of a sewer near the famous Rhine-promenade in Emmerich at the Rhine; first spiral wound lining in Europe, PEHD in DN 1050; length of the sewer 577.06 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Renewal of the sewer "Van-Gülpen-" and "Görresstraße", Emmerich at the Rhine
  • Renewal of the sewer in DN 800 and DN 900 as well as DN 700; utilised material GFRP (glass-fibre reinforced plastics); length of the sewer 303.70 m und 154.85 m
  • Special issue: Crossing of a railroad of the German Netz-AG, line no. 2270
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer repair "Hegius-", "Ingenkamp-", "Kämpchenstraße", "Hoher Weg" and "In der Laar", Emmerich at the Rhine
  • Sewer repair with Janßen Pipe Rehabilitation System with Kurzlinern, branch piece injection and various robot measures; length of the sewer 1,058.26 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer renewal and repair "Am Hasenberg", "Am Flachsacher" and "Dachsweg", Emmerich at the Rhine
  • Sewer renewal in DN 300 to DN 600; utilised pipe material GFRP (glass-fibre reinforced plastics);
    length of the sewer 400.60 m
  • Sewer repair with Shortliner and branch piece injection as well as various robot measures,
    length of the sewer 566.71 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer renewal "Hinter dem Engel", Emmerich at the Rhine
  • Sewer renewal in DN 300; utilised pipe material GFRP (glass-fibre reinforced plastics); length of the sewer
    132.75 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer and road renewal "Dr.-Robbers-Straße", Emmerich at the Rhine
  • Sewer and road renewal in DN/OD 315 und 400; utilised pipe material PP; length of the sewer 240.59 m; planning of roads and pavements
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer renewal "Gerhard-Storm-" und "Dederich-straße", Emmerich at the Rhine
  • Sewer renewal in DN 300 to DN 500; utilised pipe material GFRP (glass-fibre reinforced plastics); length of the sewer 450.46 m, 20 m of them with pneumatic drilling
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer renovation and repair "Speelberger-", "Königs-", "Hubert-Fink-" and "Wassenbergstraße", Emmerich at the Rhine
  • Sewer renovation in DN 300 to DN 600 as well as oval cross section 300/450 with GFRP (glass-fibre reinforced plastics)-Inliner (stabilised through light); length of the sewer 433.92 m
  • Sewer repair with cap profiles und branch piece injection as well as various robot measures; length of the sewer 75.76 m
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)
Project Example Sewer renewal Emmerich at the Rhine Sewer renewal "Wassenbergstraße", Emmerich at the Rhine
  • Sewer renewal in DN 500 to DN 700; utilised pipe material GFRP (glass-fibre reinforced plastics); length of the sewer 480.32 m
  • Special Condition: Many tangential branches due to house connections, which flow into the floor
  • Services provided: All parts of engineering design from base design to final documentation, including construction supervision etc. (phases 1 - 9 of the German HOAI, regulation for chartered engineers)